# Plans: wtf-string
Active planned work for the crate. Completed checklists are archived in
[COMPLETED-PLANS.md](COMPLETED-PLANS.md), and their milestones in
[COMPLETED-CHECKLIST.md](COMPLETED-CHECKLIST.md).
All ten planned milestones (M1 scaffold+design -> M10 docs/publication) are complete, so there is no
active plan. [CHECKLIST.md](CHECKLIST.md) remains for its parked `M-inf` horizon bucket: work placed
outside v1 by a recorded design decision, holding nothing pending. A row returns to the table below
when a post-v1 line of work graduates a horizon item into a numbered milestone.