# Plans: windows-file-watcher
Active planned work for the crate. Completed checklists are archived in
[COMPLETED-PLANS.md](COMPLETED-PLANS.md), and their milestones in
[COMPLETED-CHECKLIST.md](COMPLETED-CHECKLIST.md).
Numbered milestones through M17 are complete. The `M-inf` horizon items, outside v1 by recorded design decision,
are in [PARKED.md](PARKED.md).
| [PARKED.md](PARKED.md) | parked | The `M-inf` horizon: `ReadDirectoryChangesExW` extended records, digest-based change verification, and a per-volume capability cache, outside v1 by D-19. | [DESIGN-NOTES.md](DESIGN-NOTES.md) (D-19) |