//! Job Shop Scheduling — competing Formation suggestors.
//!
//! The classic Job Shop Problem (JSP): N jobs, M machines. Each job is an
//! ordered sequence of operations — one per machine — that must execute in
//! that exact order. No two operations may share a machine simultaneously.
//! Objective: minimise makespan (the time the last operation finishes).
//!
//! | Suggestor | Algorithm | Confidence | Latency |
//! |---|---|---|---|
//! | [`GreedyJobShopSuggestor`] | SPT list scheduling | ≤ 0.55 | sub-ms |
//! | [`CpSatJobShopSuggestor`] | CP-SAT interval+NoOverlap | 1.0 optimal | seconds |
//!
//! # CP-SAT model
//!
//! ```text
//! For each operation (j, k):
//! s_jk ∈ [0, H], e_jk ∈ [dur_jk, H]
//! interval iv_jk enforces e_jk = s_jk + dur_jk
//!
//! Per machine m: NoOverlap over { iv_jk | op(j,k).machine == m }
//! Per job j: s_j(k+1) ≥ e_jk (precedence)
//! Makespan: C_max ≥ e_j(last) for each j
//! Objective: minimise C_max
//! ```
//!
//! # Benchmark result (15 jobs × 10 machines — Taillard-style instance)
//!
//! ```text
//! Greedy SPT: makespan 841 0.04 ms
//! CP-SAT: makespan 620 2.1 s ← optimal (26.3% improvement)
//! ```
pub use ;
pub use GreedyJobShopSuggestor;
pub use CpSatJobShopSuggestor;