# Releasing egglog
An egglog release has two parts: publish the crates in this workspace, then
release `egglog-experimental` against the new egglog version. Publishing a
crate version is permanent, so run the dry run immediately before each real
publish and stop if it reports an error.
Set both versions before running the commands below. These example values do
not prescribe the next release number, and they do not include a leading `v`:
```sh
EGGLOG_RELEASE=3.0.0
EXPERIMENTAL_RELEASE=1.0.0
```
## 1. Prepare the egglog release PR
Start from an up-to-date `main` and create a release branch:
```sh
git switch main
git pull --ff-only
git switch -c "release-v$EGGLOG_RELEASE"
```
Make these edits:
1. In `Cargo.toml`, update `workspace.package.version` and the `version` of
every internal crate in `workspace.dependencies`. All publishable workspace
crates use the same release version, and the dependency versions must match
it.
2. In `README.md`, update the example egglog dependency version.
3. In `CHANGELOG.md`, rename the current `Unreleased` section to the new
version and release date, add a new empty `Unreleased` section, update its
comparison link, and add a link for the new version. Do not rewrite links
for old releases. Check every entry against the git history, put it under
the release that first contained the change, and include the relevant PR
number or numbers.
4. Search for any remaining references to the old version and decide whether
each should change:
```sh
rg '2\.0\.0|v2\.0\.0'
```
Replace `2.0.0` in that command with the version being superseded.
Regenerate the workspace entries in `Cargo.lock`, then run the release checks:
```sh
cargo update --workspace
make all
git diff --check
git status --short
```
Commit the changes. From that clean commit, verify all of the publishable
packages as a set:
```sh
cargo publish --dry-run --workspace --exclude egglog-wasm-example
```
This catches packaging errors across the workspace before any upload is made.
Then push the branch and open a PR. Let the normal review process finish: wait
for CI and human approval, and do not have the agent that prepared the PR merge
it. A maintainer should merge it after review.
## 2. Tag the egglog release
Tag the merged commit, not the pre-merge release-branch commit:
```sh
git switch main
git pull --ff-only
git status --short
git tag -a "v$EGGLOG_RELEASE" -m "egglog $EGGLOG_RELEASE"
git push origin "v$EGGLOG_RELEASE"
```
`git status --short` should print nothing. Check that the tag points at the
intended release commit before publishing:
```sh
git show --stat "v$EGGLOG_RELEASE"
```
## 3. Publish the egglog workspace
Authenticate once with `cargo login` if this machine does not already have a
crates.io token.
The workspace crates must be published in dependency order. The crate list can
change, so regenerate this report for every release (it requires `jq`):
```sh
cargo metadata --format-version 1 |
jq -r '
. as $m
| $m.packages[]
| select(.id as $id | $m.workspace_members | index($id))
| select(.publish != [])
| [.name, ([.dependencies[]
| select(.path != null and .kind != "dev")
| .name] | unique | join(", "))]
| @tsv
The first column lists every publishable workspace crate; the second lists its
non-development workspace dependencies. Compare the report with the command
block below: every crate must appear exactly once, and every dependency must be
published before the crate that depends on it. Update the block whenever a
crate or dependency is added. Then run each dry-run and publish pair
separately, from the repository root, and do not proceed to the next pair
unless both commands succeed:
```sh
cargo publish --dry-run -p egglog-numeric-id
cargo publish -p egglog-numeric-id
cargo publish --dry-run -p egglog-reports
cargo publish -p egglog-reports
cargo publish --dry-run -p egglog-ast
cargo publish -p egglog-ast
cargo publish --dry-run -p egglog-add-primitive
cargo publish -p egglog-add-primitive
cargo publish --dry-run -p egglog-concurrency
cargo publish -p egglog-concurrency
cargo publish --dry-run -p egglog-union-find
cargo publish -p egglog-union-find
cargo publish --dry-run -p egglog-core-relations
cargo publish -p egglog-core-relations
cargo publish --dry-run -p egglog-bridge
cargo publish -p egglog-bridge
cargo publish --dry-run -p egglog
cargo publish -p egglog
```
`egglog-wasm-example` has `publish = false` and is intentionally omitted. The
four crates without internal dependencies at the start can be published in any
order, but the order shown above is a valid order for the entire workspace.
crates.io index updates can take a little time. If the next crate reports that
the version it depends on is unavailable, wait and retry that next crate's dry
run. If `cargo publish` times out while polling the index, first check whether
the upload succeeded before running it again:
```sh
cargo info "egglog-numeric-id@$EGGLOG_RELEASE"
```
Substitute the crate that was just uploaded. Publishing many crates can also
trigger crates.io rate limiting. If that happens, do not retry in a tight loop:
wait for the cooldown, verify whether the current upload succeeded with
`cargo info`, and resume with that crate's dry run. After the final publish,
verify the main package:
```sh
cargo info "egglog@$EGGLOG_RELEASE"
```
## 4. Release egglog-experimental
Do this only after the new egglog packages are visible on crates.io. In a
separate clone of <https://github.com/egraphs-good/egglog-experimental>:
```sh
git switch main
git pull --ff-only
git switch -c "release-v$EXPERIMENTAL_RELEASE"
```
Update its `Cargo.toml` as follows:
1. Set `package.version` to `$EXPERIMENTAL_RELEASE`.
2. Search every `Cargo.toml` for `egglog` and update every dependency package
whose name starts with `egglog`, including renamed, development, build, and
target-specific dependencies:
```sh
rg -n 'egglog' --glob Cargo.toml
```
For crates.io, each dependency must have a `version` whose value is
`$EGGLOG_RELEASE`. It may also retain a `git` and `rev` for repository
development; if so, point `rev` at the tagged egglog release commit. Cargo
uses the Git source locally and the versioned registry source in the
published package.
3. Update version examples or release notes in that repository as needed.
Update its lockfile and test it:
```sh
cargo update
cargo test --release
git diff --check
git status --short
```
Commit these changes and open an egglog-experimental release PR. Wait for CI
and human approval, and do not have the agent that prepared the PR merge it. A
maintainer should merge it after review. Then tag the merged commit and publish
it:
```sh
git switch main
git pull --ff-only
git status --short
git tag -a "v$EXPERIMENTAL_RELEASE" -m "egglog-experimental $EXPERIMENTAL_RELEASE"
git push origin "v$EXPERIMENTAL_RELEASE"
cargo publish --dry-run
cargo publish
cargo info "egglog-experimental@$EXPERIMENTAL_RELEASE"
```
The tags and crates.io uploads complete the release. These repositories