use crate::estimator::EffortEstimator;
pub use crate::plan::EarningRule;
use crate::plan::{
Deliverable, DeliverableStatus, FINISH_ID, PlanGraph, PlanId, PlannerError, START_ID,
};
use crate::schedule::{compute_cpm, effort_basis};
use crate::task::CriticalPathResult;
use chrono::{DateTime, Datelike, Duration, NaiveDate, Utc, Weekday};
use serde::{Deserialize, Serialize};
use std::collections::HashMap;
#[derive(Debug, Clone, PartialEq, Serialize, Deserialize)]
#[serde(deny_unknown_fields)]
pub struct Calendar {
#[serde(default = "default_hours_per_day")]
pub hours_per_day: f32,
#[serde(default = "default_workdays")]
pub workdays: Vec<String>,
#[serde(default)]
pub utc_offset_minutes: i32,
}
fn default_hours_per_day() -> f32 {
8.0
}
fn default_workdays() -> Vec<String> {
["mon", "tue", "wed", "thu", "fri"]
.map(String::from)
.to_vec()
}
impl Default for Calendar {
fn default() -> Self {
Self {
hours_per_day: default_hours_per_day(),
workdays: default_workdays(),
utc_offset_minutes: 0,
}
}
}
#[derive(Debug, Clone, PartialEq, Serialize, Deserialize)]
pub struct BaselineRow {
pub id: String,
pub es: f32,
pub ef: f32,
pub budget: f32,
#[serde(default = "one")]
pub cost_rate: f32,
}
fn one() -> f32 {
1.0
}
#[derive(Debug, Clone, PartialEq, Serialize, Deserialize)]
pub struct Baseline {
pub number: u32,
pub start: DateTime<Utc>,
pub calendar: Option<Calendar>,
pub rows: Vec<BaselineRow>,
pub bac: f32,
pub finish_hours: f32,
#[serde(default)]
pub backfilled: bool,
}
#[derive(Debug, Clone, Default, PartialEq, Serialize, Deserialize)]
pub struct Actuals {
pub earned_pct: Option<u8>,
pub actual_hours: Option<f32>,
pub leased_hours: f32,
pub evidence: Vec<String>,
#[serde(default)]
pub removed_at: Option<DateTime<Utc>>,
#[serde(default)]
pub frozen_pct: Option<u8>,
}
#[derive(Debug, Clone, PartialEq, Eq, Serialize, Deserialize)]
#[serde(tag = "status", rename_all = "snake_case")]
pub enum EvRowStatus {
Pending,
Ready,
InProgress,
Complete,
Failed {
reason: String,
},
Removed,
}
impl From<DeliverableStatus> for EvRowStatus {
fn from(s: DeliverableStatus) -> Self {
match s {
DeliverableStatus::Pending => Self::Pending,
DeliverableStatus::Ready => Self::Ready,
DeliverableStatus::InProgress => Self::InProgress,
DeliverableStatus::Complete => Self::Complete,
DeliverableStatus::Failed { reason } => Self::Failed { reason },
}
}
}
impl PartialEq<DeliverableStatus> for EvRowStatus {
fn eq(&self, other: &DeliverableStatus) -> bool {
match (self, other) {
(Self::Pending, DeliverableStatus::Pending)
| (Self::Ready, DeliverableStatus::Ready)
| (Self::InProgress, DeliverableStatus::InProgress)
| (Self::Complete, DeliverableStatus::Complete) => true,
(Self::Failed { reason: a }, DeliverableStatus::Failed { reason: b }) => a == b,
_ => false,
}
}
}
#[derive(Debug, Clone, PartialEq, Serialize, Deserialize)]
pub struct Undefined {
pub field: String,
pub reason: String,
}
#[derive(Debug, Clone, PartialEq, Serialize, Deserialize)]
pub struct EvRow {
pub id: String,
pub budget: f32,
pub pv: f32,
pub earned_pct: f32,
pub ev: f32,
pub ac: f32,
pub status: EvRowStatus,
}
#[derive(Debug, Clone, PartialEq, Serialize, Deserialize)]
pub struct EvSummary {
pub baseline_number: u32,
pub spi: Option<f32>,
pub cpi: Option<f32>,
#[serde(default)]
pub backfilled: bool,
}
#[derive(Debug, Clone, PartialEq, Serialize, Deserialize)]
pub struct EvReport {
pub as_of: DateTime<Utc>,
pub baseline_number: u32,
#[serde(default)]
pub backfilled: bool,
pub bac: f32,
pub pv: f32,
pub ev: f32,
pub ac: f32,
pub sv: f32,
pub cv: f32,
pub spi: Option<f32>,
pub cpi: Option<f32>,
pub eac: Option<f32>,
pub etc: Option<f32>,
pub vac: Option<f32>,
pub tcpi: Option<f32>,
pub undefined: Vec<Undefined>,
pub rows: Vec<EvRow>,
pub critical_float_consumed_hours: f32,
pub alerts: Vec<String>,
pub excluded_unbaselined: Vec<String>,
}
fn weekday_from_name(name: &str) -> Option<Weekday> {
Some(match name {
"mon" => Weekday::Mon,
"tue" => Weekday::Tue,
"wed" => Weekday::Wed,
"thu" => Weekday::Thu,
"fri" => Weekday::Fri,
"sat" => Weekday::Sat,
"sun" => Weekday::Sun,
_ => return None,
})
}
fn workdays_per_week(days: &[Weekday]) -> usize {
let mut uniq = days.to_vec();
uniq.sort_by_key(|d| d.num_days_from_monday());
uniq.dedup();
uniq.len()
}
fn cost_rate(d: &Deliverable) -> Result<f32, PlannerError> {
match d.metadata.get("cost_rate") {
None | Some(serde_json::Value::Null) => Ok(1.0),
Some(v) => match v.as_f64() {
Some(x) if x.is_finite() && x >= 0.0 && x <= f64::from(f32::MAX) => Ok(x as f32),
_ => Err(PlannerError::InvalidGraph {
reason: format!(
"deliverable {:?}: metadata.cost_rate must be a finite number >= 0, got {v}",
d.id
),
}),
},
}
}
fn budget_of(d: &Deliverable, estimator: &EffortEstimator) -> Result<f32, PlannerError> {
let budget = effort_basis(d, estimator) * cost_rate(d)?;
if budget.is_finite() {
Ok(budget)
} else {
Err(PlannerError::InvalidGraph {
reason: format!("deliverable {:?}: budget is not finite", d.id),
})
}
}
fn finish_of(cpm: &CriticalPathResult) -> f32 {
cpm.tasks
.iter()
.find(|t| t.id == FINISH_ID)
.map(|t| t.earliest_finish)
.unwrap_or_else(|| {
cpm.tasks
.iter()
.map(|t| t.earliest_finish)
.fold(0.0, f32::max)
})
}
pub fn frozen_pct(rule: EarningRule, status: &DeliverableStatus, reported: Option<u8>) -> u8 {
earned_pct(rule, status, reported.map(|p| p.min(100))).clamp(0.0, 100.0) as u8
}
fn earned_pct(rule: EarningRule, status: &DeliverableStatus, reported: Option<u8>) -> f64 {
if *status == DeliverableStatus::Complete {
return 100.0;
}
match rule {
EarningRule::ZeroHundred => 0.0,
EarningRule::FiftyFifty => {
if *status == DeliverableStatus::InProgress || reported.is_some() {
50.0
} else {
0.0
}
}
EarningRule::Weighted => f64::from(reported.unwrap_or(0)),
}
}
impl Calendar {
pub fn validate(&self) -> Result<(), PlannerError> {
let bad = |reason: String| Err(PlannerError::InvalidGraph { reason });
if !(self.hours_per_day.is_finite()
&& self.hours_per_day > 0.0
&& self.hours_per_day <= 24.0)
{
return bad(format!(
"calendar.hours_per_day must be in (0, 24], got {}",
self.hours_per_day
));
}
if !(-1440..=1440).contains(&self.utc_offset_minutes) {
return bad(format!(
"calendar.utc_offset_minutes must be in [-1440, 1440], got {}",
self.utc_offset_minutes
));
}
if self.workdays.is_empty() {
return bad("calendar.workdays must not be empty".to_string());
}
for name in &self.workdays {
if weekday_from_name(name).is_none() {
return bad(format!(
"calendar.workdays entry {name:?} is not a lowercase 3-letter weekday (mon..sun)"
));
}
}
Ok(())
}
}
pub fn elapsed_hours(
start: DateTime<Utc>,
as_of: DateTime<Utc>,
calendar: Option<&Calendar>,
) -> Result<f32, PlannerError> {
if as_of <= start {
return Ok(0.0);
}
let Some(calendar) = calendar else {
return Ok((as_of - start).num_milliseconds() as f32 / 3_600_000.0);
};
calendar.validate()?;
let off = Duration::minutes(i64::from(calendar.utc_offset_minutes));
let (ls, le) = (start.naive_utc() + off, as_of.naive_utc() + off);
let workdays: Vec<Weekday> = calendar
.workdays
.iter()
.filter_map(|n| weekday_from_name(n))
.collect();
let hpd = f64::from(calendar.hours_per_day);
let is_work = |d: NaiveDate| workdays.contains(&d.weekday());
let partial = |d: NaiveDate, from: chrono::NaiveDateTime, to: chrono::NaiveDateTime| -> f64 {
if !is_work(d) {
return 0.0;
}
let day0 = d.and_hms_opt(0, 0, 0).unwrap_or(from);
let lo = (from - day0).num_milliseconds() as f64 / 3_600_000.0;
let hi = (to - day0).num_milliseconds() as f64 / 3_600_000.0;
(hi.min(hpd) - lo.max(0.0)).max(0.0)
};
let (sd, ed) = (ls.date(), le.date());
let total = if sd == ed {
partial(sd, ls, le)
} else {
let mut t = partial(sd, ls, le) + partial(ed, ls, le);
let interior = (ed - sd).num_days() - 1;
let weeks = interior / 7;
let per_week = workdays_per_week(&workdays) as f64;
t += weeks as f64 * per_week * hpd;
let mut d = sd + Duration::days(1 + weeks * 7);
while d < ed {
if is_work(d) {
t += hpd;
}
d += Duration::days(1);
}
t
};
Ok(total as f32)
}
pub fn build_baseline(
graph: &PlanGraph,
cpm: &CriticalPathResult,
start: DateTime<Utc>,
calendar: Option<Calendar>,
number: u32,
) -> Result<Baseline, PlannerError> {
if let Some(c) = &calendar {
c.validate()?;
}
let by_id: HashMap<&str, &crate::task::Task> =
cpm.tasks.iter().map(|t| (t.id.as_str(), t)).collect();
let estimator = EffortEstimator::new();
let mut rows = Vec::new();
for d in &graph.deliverables {
if d.id == START_ID || d.id == FINISH_ID {
continue;
}
let Some(t) = by_id.get(d.id.as_str()) else {
return Err(PlannerError::InvalidGraph {
reason: format!("deliverable {:?} missing from CPM result", d.id),
});
};
rows.push(BaselineRow {
id: d.id.clone(),
es: t.earliest_start,
ef: t.earliest_finish,
budget: budget_of(d, &estimator)?,
cost_rate: cost_rate(d)?,
});
}
let bac = rows.iter().map(|r| f64::from(r.budget)).sum::<f64>() as f32;
if !bac.is_finite() {
return Err(PlannerError::InvalidGraph {
reason: "budget at completion (sum of effort x cost_rate) exceeds the f32 range"
.to_string(),
});
}
Ok(Baseline {
number,
start,
calendar,
rows,
bac,
finish_hours: finish_of(cpm),
backfilled: false,
})
}
pub fn compute_ev(
baseline: &Baseline,
graph: &PlanGraph,
statuses: &HashMap<String, DeliverableStatus>,
rules: &HashMap<String, EarningRule>,
actuals: &HashMap<String, Actuals>,
as_of: DateTime<Utc>,
previous_snapshots: &[EvSummary],
) -> Result<EvReport, PlannerError> {
let t = f64::from(elapsed_hours(
baseline.start,
as_of,
baseline.calendar.as_ref(),
)?);
let (mut pv, mut ev, mut ac) = (0.0_f64, 0.0_f64, 0.0_f64);
let mut rows = Vec::with_capacity(baseline.rows.len());
let live: std::collections::HashSet<&str> =
graph.deliverables.iter().map(|d| d.id.as_str()).collect();
let valid = |h: f32| h.is_finite() && h >= 0.0;
let hours_of = |a: &Actuals| -> f32 {
let h = match a.actual_hours {
Some(h) if valid(h) => h,
_ => a.leased_hours,
};
if valid(h) { h } else { 0.0 }
};
for r in &baseline.rows {
let budget = f64::from(r.budget);
let (es, ef) = (f64::from(r.es), f64::from(r.ef));
let row_pv = if ef <= es {
if t >= es { budget } else { 0.0 }
} else {
budget * ((t - es) / (ef - es)).clamp(0.0, 1.0)
};
let act = actuals.get(&r.id);
let (status, pct) = if live.contains(r.id.as_str()) {
let status = statuses
.get(&r.id)
.cloned()
.unwrap_or(DeliverableStatus::Pending);
let rule = rules.get(&r.id).copied().unwrap_or_default();
let reported = act.and_then(|a| a.earned_pct).map(|p| p.min(100));
let pct = earned_pct(rule, &status, reported);
(EvRowStatus::from(status), pct)
} else {
let frozen = act.and_then(|a| a.frozen_pct).map_or(0, |p| p.min(100));
(EvRowStatus::Removed, f64::from(frozen))
};
let hours = act.map_or(0.0, hours_of);
let row_ev = budget * pct / 100.0;
let row_ac = f64::from(r.cost_rate) * f64::from(hours);
pv += row_pv;
ev += row_ev;
rows.push(EvRow {
id: r.id.clone(),
budget: r.budget,
pv: row_pv as f32,
earned_pct: pct as f32,
ev: row_ev as f32,
ac: row_ac as f32,
status,
});
}
let rates: HashMap<&str, f32> = baseline
.rows
.iter()
.map(|r| (r.id.as_str(), r.cost_rate))
.collect();
let mut spend: Vec<(&String, &Actuals)> = actuals.iter().collect();
spend.sort_by(|a, b| a.0.cmp(b.0));
for (id, a) in spend {
let rate = rates.get(id.as_str()).copied().unwrap_or(1.0);
ac += f64::from(rate) * f64::from(hours_of(a));
}
let bac: f64 = baseline.rows.iter().map(|r| f64::from(r.budget)).sum();
let mut undefined = Vec::new();
let mut ratio = |field: &str, v: Option<f64>, reason: &str| -> Option<f64> {
let out = v.filter(|x| (*x as f32).is_finite());
if out.is_none() {
let reason = if v.is_some() {
"result is not finite as f32"
} else {
reason
};
undefined.push(Undefined {
field: field.to_string(),
reason: reason.to_string(),
});
}
out
};
let spi = ratio(
"spi",
(pv != 0.0).then(|| ev / pv),
"PV is 0 before any work was planned",
);
let cpi = ratio(
"cpi",
(ac != 0.0).then(|| ev / ac),
"AC is 0, no cost recorded yet",
);
let eac_reason = if cpi.is_none() {
"CPI is undefined"
} else {
"CPI is 0, nothing earned for the cost spent"
};
let eac = ratio(
"eac",
cpi.filter(|c| *c != 0.0).map(|c| bac / c),
eac_reason,
);
let etc = ratio("etc", eac.map(|e| e - ac), "EAC is undefined");
let vac = ratio("vac", eac.map(|e| bac - e), "EAC is undefined");
let tcpi = ratio(
"tcpi",
((bac - ac).abs() > 1e-9 * bac.max(1.0)).then(|| (bac - ev) / (bac - ac)),
"BAC - AC is 0, no budget remains",
);
let out = |v: Option<f64>| v.map(|x| x as f32);
let cpm = compute_cpm(graph)?;
let critical_float = (finish_of(&cpm) - baseline.finish_hours).max(0.0);
let alerts = trend_alerts(previous_snapshots, baseline.number);
for (field, v) in [
("pv", pv),
("ev", ev),
("ac", ac),
("sv", ev - pv),
("cv", ev - ac),
] {
if !(v as f32).is_finite() {
return Err(PlannerError::InvalidGraph {
reason: format!(
"earned-value total {field} exceeds the f32 range (check cost_rate and \
reported hours)"
),
});
}
}
let report = EvReport {
as_of,
baseline_number: baseline.number,
backfilled: baseline.backfilled,
bac: baseline.bac,
pv: pv as f32,
ev: ev as f32,
ac: ac as f32,
sv: (ev - pv) as f32,
cv: (ev - ac) as f32,
spi: out(spi),
cpi: out(cpi),
eac: out(eac),
etc: out(etc),
vac: out(vac),
tcpi: out(tcpi),
undefined,
rows,
critical_float_consumed_hours: critical_float,
alerts,
excluded_unbaselined: {
let known: std::collections::HashSet<&str> =
baseline.rows.iter().map(|r| r.id.as_str()).collect();
let mut v: Vec<String> = graph
.deliverables
.iter()
.filter(|d| d.id != START_ID && d.id != FINISH_ID && !known.contains(d.id.as_str()))
.map(|d| d.id.clone())
.collect();
v.sort();
v
},
};
Ok(report)
}
pub const MAX_BASELINE_REASON_CHARS: usize = crate::plan::MAX_EVIDENCE_CHARS;
pub const SNAPSHOT_EXPORT_LIMIT: usize = 100;
#[derive(Debug, Clone, PartialEq)]
pub struct BaselineRequest {
pub plan_id: PlanId,
pub start: Option<DateTime<Utc>>,
pub calendar: Option<Calendar>,
pub reason: Option<String>,
pub backfill_from: Option<DateTime<Utc>>,
}
impl BaselineRequest {
pub fn new(plan_id: PlanId) -> Self {
Self {
plan_id,
start: None,
calendar: None,
reason: None,
backfill_from: None,
}
}
pub fn with_start(mut self, start: DateTime<Utc>) -> Self {
self.start = Some(start);
self
}
pub fn with_backfill_from(mut self, backfill_from: DateTime<Utc>) -> Self {
self.backfill_from = Some(backfill_from);
self
}
pub fn with_calendar(mut self, calendar: Calendar) -> Self {
self.calendar = Some(calendar);
self
}
pub fn with_reason(mut self, reason: impl Into<String>) -> Self {
self.reason = Some(reason.into());
self
}
}
#[derive(Debug, Clone, PartialEq, Serialize, Deserialize)]
pub struct BaselineOutcome {
pub plan_id: String,
pub baseline_number: u32,
pub start: DateTime<Utc>,
pub calendar: Option<Calendar>,
pub bac: f32,
pub finish_hours: f32,
pub deliverable_count: usize,
pub reason: Option<String>,
#[serde(default)]
pub backfilled: bool,
}
pub const FIRST_EXECUTION_REASON: &str = "first_execution";
#[derive(Debug, Clone, Copy, Default, PartialEq, Eq)]
pub enum BaselineMode {
#[default]
Auto,
Refuse,
}
#[derive(Debug, Clone, PartialEq, Serialize, Deserialize)]
pub struct BaselineTaken {
pub baseline_number: u32,
pub as_of: DateTime<Utc>,
pub reason: String,
}
#[derive(Debug, Clone, PartialEq, Serialize, Deserialize)]
pub struct PlanBaseline {
pub baseline_number: u32,
pub as_of: DateTime<Utc>,
}
#[derive(Debug, Clone, Copy, Default, PartialEq, Eq, Serialize, Deserialize)]
#[serde(rename_all = "snake_case")]
pub enum SnapshotFormat {
#[default]
Json,
Markdown,
}
#[derive(Debug, Clone, PartialEq)]
pub struct SnapshotRequest {
pub plan_id: PlanId,
pub as_of: Option<DateTime<Utc>>,
pub format: SnapshotFormat,
}
impl SnapshotRequest {
pub fn new(plan_id: PlanId) -> Self {
Self {
plan_id,
as_of: None,
format: SnapshotFormat::default(),
}
}
pub fn with_as_of(mut self, as_of: DateTime<Utc>) -> Self {
self.as_of = Some(as_of);
self
}
pub fn with_format(mut self, format: SnapshotFormat) -> Self {
self.format = format;
self
}
}
#[derive(Debug, Clone, PartialEq, Serialize)]
pub struct SnapshotOutcome {
pub summary: SnapshotSummary,
pub format: SnapshotFormat,
pub export: serde_json::Value,
pub snapshot_count: usize,
}
pub fn trend_alerts(snapshots: &[EvSummary], baseline_number: u32) -> Vec<String> {
let mut alerts = Vec::new();
let current: Vec<&EvSummary> = snapshots
.iter()
.filter(|s| s.baseline_number == baseline_number && !s.backfilled)
.collect();
if let [.., a, b] = current.as_slice() {
let low = |v: Option<f32>| v.is_some_and(|x| x < 0.9);
if low(a.spi) && low(b.spi) {
alerts.push("SPI_BELOW_0_9".to_string());
}
if low(a.cpi) && low(b.cpi) {
alerts.push("CPI_BELOW_0_9".to_string());
}
}
alerts
}
#[derive(Debug, Clone, PartialEq, Serialize, Deserialize)]
pub struct SnapshotSummary {
pub taken_at: DateTime<Utc>,
pub as_of: DateTime<Utc>,
pub baseline_number: u32,
pub bac: f32,
pub pv: f32,
pub ev: f32,
pub ac: f32,
pub sv: f32,
pub cv: f32,
pub spi: Option<f32>,
pub cpi: Option<f32>,
pub eac: Option<f32>,
pub etc: Option<f32>,
pub vac: Option<f32>,
pub tcpi: Option<f32>,
#[serde(default)]
pub undefined: Vec<Undefined>,
pub alerts: Vec<String>,
#[serde(default)]
pub backfilled: bool,
}
pub const BACKFILL_TOLERANCE_HOURS: i64 = 1;
pub fn is_backfilled(as_of: DateTime<Utc>, taken_at: DateTime<Utc>) -> bool {
as_of < taken_at - Duration::hours(BACKFILL_TOLERANCE_HOURS)
}
impl SnapshotSummary {
pub fn from_report(report: &EvReport, taken_at: DateTime<Utc>) -> Self {
Self {
taken_at,
as_of: report.as_of,
baseline_number: report.baseline_number,
bac: report.bac,
pv: report.pv,
ev: report.ev,
ac: report.ac,
sv: report.sv,
cv: report.cv,
spi: report.spi,
cpi: report.cpi,
eac: report.eac,
etc: report.etc,
vac: report.vac,
tcpi: report.tcpi,
undefined: report.undefined.clone(),
alerts: report.alerts.clone(),
backfilled: is_backfilled(report.as_of, taken_at),
}
}
pub fn ratios(&self) -> EvSummary {
EvSummary {
baseline_number: self.baseline_number,
spi: self.spi,
cpi: self.cpi,
backfilled: self.backfilled,
}
}
}
pub fn render_snapshots_markdown(snapshots: &[SnapshotSummary]) -> String {
let ratio = |v: Option<f32>| v.map_or_else(|| "n/a".to_string(), |x| format!("{x:.2}"));
let mut out = String::from(
"| date | PV | EV | AC | SPI | CPI | EAC |\n|---|---:|---:|---:|---:|---:|---:|\n",
);
for s in snapshots {
out.push_str(&format!(
"| {} | {:.2} | {:.2} | {:.2} | {} | {} | {} |\n",
s.as_of.format("%Y-%m-%dT%H:%MZ"),
s.pv,
s.ev,
s.ac,
ratio(s.spi),
ratio(s.cpi),
ratio(s.eac),
));
}
out
}
#[cfg(test)]
mod tests {
use super::*;
use chrono::{TimeZone, Timelike};
const EPS: f32 = 1e-3;
fn at(y: i32, m: u32, d: u32, h: u32) -> DateTime<Utc> {
Utc.with_ymd_and_hms(y, m, d, h, 0, 0).unwrap()
}
fn near(a: f32, b: f32) -> bool {
(a - b).abs() < EPS
}
fn deliverable(id: &str, effort: f32, prereqs: &[&str]) -> Deliverable {
Deliverable {
id: id.to_string(),
owned_files: vec![],
prerequisites: prereqs
.iter()
.map(|p| crate::plan::Prerequisite::Id((*p).to_string()))
.collect(),
estimated_effort_hours: Some(effort),
duration_hours: None,
estimate: None,
metadata: serde_json::Value::Null,
milestone: false,
earning_rule: None,
}
}
fn graph(ds: Vec<Deliverable>) -> PlanGraph {
PlanGraph {
deliverables: ds,
max_chained_dispatch: None,
}
}
fn row(id: &str, es: f32, ef: f32, budget: f32) -> BaselineRow {
BaselineRow {
id: id.to_string(),
es,
ef,
budget,
cost_rate: 1.0,
}
}
fn baseline(rows: Vec<BaselineRow>) -> Baseline {
let bac = rows.iter().map(|r| r.budget).sum();
let finish_hours = rows.iter().map(|r| r.ef).fold(0.0, f32::max);
Baseline {
number: 1,
start: at(2026, 1, 5, 0),
calendar: None,
rows,
bac,
finish_hours,
backfilled: false,
}
}
fn statuses(pairs: &[(&str, DeliverableStatus)]) -> HashMap<String, DeliverableStatus> {
pairs
.iter()
.map(|(k, v)| ((*k).to_string(), v.clone()))
.collect()
}
fn report(
b: &Baseline,
g: &PlanGraph,
st: &HashMap<String, DeliverableStatus>,
rules: &HashMap<String, EarningRule>,
actuals: &HashMap<String, Actuals>,
hours: i64,
) -> EvReport {
let as_of = b.start + Duration::hours(hours);
compute_ev(b, g, st, rules, actuals, as_of, &[]).unwrap()
}
fn one(rule: EarningRule, status: DeliverableStatus, pct: Option<u8>) -> EvReport {
let b = baseline(vec![row("a", 0.0, 10.0, 100.0)]);
let g = graph(vec![deliverable("a", 100.0, &[])]);
let st = statuses(&[("a", status)]);
let rules = HashMap::from([("a".to_string(), rule)]);
let actuals = HashMap::from([(
"a".to_string(),
Actuals {
earned_pct: pct,
..Actuals::default()
},
)]);
report(&b, &g, &st, &rules, &actuals, 5)
}
fn textbook() -> EvReport {
let b = baseline(vec![row("a", 0.0, 10.0, 50.0), row("b", 10.0, 20.0, 50.0)]);
let g = graph(vec![
deliverable("a", 50.0, &[]),
deliverable("b", 50.0, &["a"]),
]);
let st = statuses(&[("a", DeliverableStatus::InProgress)]);
let rules = HashMap::from([("a".to_string(), EarningRule::Weighted)]);
let actuals = HashMap::from([(
"a".to_string(),
Actuals {
earned_pct: Some(80),
actual_hours: Some(48.0),
..Actuals::default()
},
)]);
report(&b, &g, &st, &rules, &actuals, 10)
}
#[test]
fn wall_clock_elapsed_is_plain_hours() {
let h = elapsed_hours(at(2026, 1, 5, 0), at(2026, 1, 6, 6), None).unwrap();
assert!(near(h, 30.0));
}
#[test]
fn elapsed_before_start_is_zero() {
let h = elapsed_hours(at(2026, 1, 5, 0), at(2026, 1, 4, 0), None).unwrap();
assert!(near(h, 0.0));
}
#[test]
fn calendar_skips_weekends() {
let c = Calendar::default();
let h = elapsed_hours(at(2026, 1, 9, 0), at(2026, 1, 12, 0), Some(&c)).unwrap();
assert!(near(h, 8.0));
}
#[test]
fn calendar_counts_partial_day() {
let c = Calendar::default();
let start = at(2026, 1, 5, 3);
let h = elapsed_hours(start, start + Duration::minutes(150), Some(&c)).unwrap();
assert!(near(h, 2.5));
}
#[test]
fn calendar_ignores_hours_after_the_working_window() {
let c = Calendar::default();
let h = elapsed_hours(at(2026, 1, 5, 0), at(2026, 1, 5, 20), Some(&c)).unwrap();
assert!(near(h, 8.0));
}
#[test]
fn calendar_over_many_weeks_counts_whole_weeks() {
let c = Calendar::default();
let h = elapsed_hours(at(2026, 1, 5, 0), at(2026, 3, 16, 0), Some(&c)).unwrap();
assert!(near(h, 400.0));
}
#[test]
fn calendar_utc_offset_shifts_the_local_day() {
let c = Calendar {
utc_offset_minutes: 120,
..Calendar::default()
};
let h = elapsed_hours(at(2026, 1, 5, 22), at(2026, 1, 6, 0), Some(&c)).unwrap();
assert!(near(h, 2.0));
}
#[test]
fn calendar_custom_workdays_count_only_listed_days() {
let c = Calendar {
workdays: vec!["sat".into()],
..Calendar::default()
};
let h = elapsed_hours(at(2026, 1, 5, 0), at(2026, 1, 12, 0), Some(&c)).unwrap();
assert!(near(h, 8.0));
}
fn invalid(c: Calendar) -> bool {
matches!(c.validate(), Err(PlannerError::InvalidGraph { .. }))
}
#[test]
fn calendar_rejects_zero_hours_per_day() {
assert!(invalid(Calendar {
hours_per_day: 0.0,
..Calendar::default()
}));
}
#[test]
fn calendar_rejects_more_than_24_hours_per_day() {
assert!(invalid(Calendar {
hours_per_day: 24.5,
..Calendar::default()
}));
}
#[test]
fn calendar_rejects_nan_hours_per_day() {
assert!(invalid(Calendar {
hours_per_day: f32::NAN,
..Calendar::default()
}));
}
#[test]
fn calendar_rejects_out_of_range_offset() {
assert!(invalid(Calendar {
utc_offset_minutes: 1441,
..Calendar::default()
}));
}
#[test]
fn calendar_rejects_empty_workdays() {
assert!(invalid(Calendar {
workdays: vec![],
..Calendar::default()
}));
}
#[test]
fn calendar_rejects_unknown_weekday_name() {
assert!(invalid(Calendar {
workdays: vec!["monday".into()],
..Calendar::default()
}));
}
#[test]
fn calendar_accepts_a_24_hour_day() {
assert!(
Calendar {
hours_per_day: 24.0,
..Calendar::default()
}
.validate()
.is_ok()
);
}
#[test]
fn pv_interpolates_linearly_inside_a_task() {
let b = baseline(vec![row("a", 10.0, 20.0, 100.0)]);
let g = graph(vec![deliverable("a", 100.0, &[])]);
let r = report(
&b,
&g,
&HashMap::new(),
&HashMap::new(),
&HashMap::new(),
15,
);
assert!(near(r.pv, 50.0));
}
#[test]
fn pv_is_zero_before_task_start() {
let b = baseline(vec![row("a", 10.0, 20.0, 100.0)]);
let g = graph(vec![deliverable("a", 100.0, &[])]);
let r = report(&b, &g, &HashMap::new(), &HashMap::new(), &HashMap::new(), 5);
assert!(near(r.pv, 0.0));
}
#[test]
fn pv_caps_at_budget_after_task_finish() {
let b = baseline(vec![row("a", 10.0, 20.0, 100.0)]);
let g = graph(vec![deliverable("a", 100.0, &[])]);
let r = report(
&b,
&g,
&HashMap::new(),
&HashMap::new(),
&HashMap::new(),
99,
);
assert!(near(r.pv, 100.0));
}
#[test]
fn pv_of_zero_length_task_is_zero_before_its_start() {
let b = baseline(vec![row("m", 10.0, 10.0, 5.0)]);
let g = graph(vec![deliverable("m", 5.0, &[])]);
let r = report(&b, &g, &HashMap::new(), &HashMap::new(), &HashMap::new(), 9);
assert!(near(r.pv, 0.0));
}
#[test]
fn pv_of_zero_length_task_steps_to_budget_at_its_start() {
let b = baseline(vec![row("m", 10.0, 10.0, 5.0)]);
let g = graph(vec![deliverable("m", 5.0, &[])]);
let r = report(
&b,
&g,
&HashMap::new(),
&HashMap::new(),
&HashMap::new(),
10,
);
assert!(near(r.pv, 5.0));
}
#[test]
fn zero_hundred_earns_nothing_while_in_progress() {
let r = one(
EarningRule::ZeroHundred,
DeliverableStatus::InProgress,
Some(90),
);
assert!(near(r.ev, 0.0));
}
#[test]
fn zero_hundred_earns_full_budget_when_complete() {
let r = one(EarningRule::ZeroHundred, DeliverableStatus::Complete, None);
assert!(near(r.ev, 100.0));
}
#[test]
fn default_rule_is_zero_hundred_when_unmapped() {
let b = baseline(vec![row("a", 0.0, 10.0, 100.0)]);
let g = graph(vec![deliverable("a", 100.0, &[])]);
let st = statuses(&[("a", DeliverableStatus::InProgress)]);
let r = report(&b, &g, &st, &HashMap::new(), &HashMap::new(), 5);
assert!(near(r.ev, 0.0));
}
#[test]
fn fifty_fifty_earns_half_when_in_progress() {
let r = one(EarningRule::FiftyFifty, DeliverableStatus::InProgress, None);
assert!(near(r.ev, 50.0));
}
#[test]
fn fifty_fifty_earns_half_when_any_percent_reported() {
let r = one(EarningRule::FiftyFifty, DeliverableStatus::Ready, Some(10));
assert!(near(r.ev, 50.0));
}
#[test]
fn fifty_fifty_earns_full_when_complete() {
let r = one(EarningRule::FiftyFifty, DeliverableStatus::Complete, None);
assert!(near(r.ev, 100.0));
}
#[test]
fn weighted_earns_the_reported_percent() {
let r = one(
EarningRule::Weighted,
DeliverableStatus::InProgress,
Some(30),
);
assert!(near(r.ev, 30.0));
}
#[test]
fn weighted_earns_nothing_without_a_report() {
let r = one(EarningRule::Weighted, DeliverableStatus::InProgress, None);
assert!(near(r.ev, 0.0));
}
#[test]
fn weighted_ignores_reported_percent_once_complete() {
let r = one(EarningRule::Weighted, DeliverableStatus::Complete, Some(40));
assert!(near(r.ev, 100.0));
}
#[test]
fn failed_deliverable_earns_nothing_under_zero_hundred() {
let r = one(
EarningRule::ZeroHundred,
DeliverableStatus::Failed { reason: "x".into() },
None,
);
assert!(near(r.ev, 0.0));
}
fn ac_for(actual: Option<f32>, leased: f32, rate: Option<f64>) -> f32 {
let mut br = row("a", 0.0, 10.0, 100.0);
br.cost_rate = rate.unwrap_or(1.0) as f32;
let b = baseline(vec![br]);
let g = graph(vec![deliverable("a", 100.0, &[])]);
let actuals = HashMap::from([(
"a".to_string(),
Actuals {
actual_hours: actual,
leased_hours: leased,
..Actuals::default()
},
)]);
report(&b, &g, &HashMap::new(), &HashMap::new(), &actuals, 5).ac
}
#[test]
fn ac_prefers_reported_hours_over_leased() {
assert!(near(ac_for(Some(7.0), 3.0, None), 7.0));
}
#[test]
fn ac_falls_back_to_leased_hours() {
assert!(near(ac_for(None, 3.0, None), 3.0));
}
#[test]
fn ac_is_scaled_by_cost_rate() {
assert!(near(ac_for(Some(4.0), 0.0, Some(2.5)), 10.0));
}
#[test]
fn baseline_budget_is_effort_times_cost_rate() {
let mut d = deliverable("a", 10.0, &[]);
d.metadata = serde_json::json!({ "cost_rate": 3.0 });
let g = graph(vec![d]);
let cpm = compute_cpm(&g).unwrap();
let b = build_baseline(&g, &cpm, at(2026, 1, 5, 0), None, 1).unwrap();
assert!(near(b.bac, 30.0));
}
#[test]
fn baseline_defaults_cost_rate_to_one() {
let g = graph(vec![deliverable("a", 10.0, &[])]);
let cpm = compute_cpm(&g).unwrap();
let b = build_baseline(&g, &cpm, at(2026, 1, 5, 0), None, 1).unwrap();
assert!(near(b.bac, 10.0));
}
#[test]
fn baseline_excludes_synthetic_endpoints() {
let g = graph(vec![deliverable("a", 10.0, &[])]);
let cpm = compute_cpm(&g).unwrap();
let b = build_baseline(&g, &cpm, at(2026, 1, 5, 0), None, 1).unwrap();
assert_eq!(b.rows.len(), 1);
}
#[test]
fn baseline_freezes_cpm_start_and_finish() {
let g = graph(vec![
deliverable("a", 10.0, &[]),
deliverable("b", 5.0, &["a"]),
]);
let cpm = compute_cpm(&g).unwrap();
let b = build_baseline(&g, &cpm, at(2026, 1, 5, 0), None, 1).unwrap();
let rb = b.rows.iter().find(|r| r.id == "b").unwrap();
assert!(near(rb.es, 10.0) && near(rb.ef, 15.0));
}
#[test]
fn baseline_records_finish_hours() {
let g = graph(vec![
deliverable("a", 10.0, &[]),
deliverable("b", 5.0, &["a"]),
]);
let cpm = compute_cpm(&g).unwrap();
let b = build_baseline(&g, &cpm, at(2026, 1, 5, 0), None, 1).unwrap();
assert!(near(b.finish_hours, 15.0));
}
#[test]
fn baseline_rejects_negative_cost_rate() {
let mut d = deliverable("a", 10.0, &[]);
d.metadata = serde_json::json!({ "cost_rate": -1.0 });
let g = graph(vec![d]);
let cpm = compute_cpm(&g).unwrap();
let e = build_baseline(&g, &cpm, at(2026, 1, 5, 0), None, 1);
assert!(matches!(e, Err(PlannerError::InvalidGraph { .. })));
}
#[test]
fn baseline_rejects_non_numeric_cost_rate() {
let mut d = deliverable("a", 10.0, &[]);
d.metadata = serde_json::json!({ "cost_rate": "free" });
let g = graph(vec![d]);
let cpm = compute_cpm(&g).unwrap();
let e = build_baseline(&g, &cpm, at(2026, 1, 5, 0), None, 1);
assert!(matches!(e, Err(PlannerError::InvalidGraph { .. })));
}
#[test]
fn baseline_rejects_invalid_calendar() {
let g = graph(vec![deliverable("a", 10.0, &[])]);
let cpm = compute_cpm(&g).unwrap();
let c = Calendar {
hours_per_day: 0.0,
..Calendar::default()
};
let e = build_baseline(&g, &cpm, at(2026, 1, 5, 0), Some(c), 1);
assert!(matches!(e, Err(PlannerError::InvalidGraph { .. })));
}
#[test]
fn budget_in_ev_report_is_baseline_budget() {
let r = textbook();
assert!(near(r.bac, 100.0));
}
#[test]
fn textbook_pv() {
assert!(near(textbook().pv, 50.0));
}
#[test]
fn textbook_ev() {
assert!(near(textbook().ev, 40.0));
}
#[test]
fn textbook_ac() {
assert!(near(textbook().ac, 48.0));
}
#[test]
fn textbook_sv() {
assert!(near(textbook().sv, -10.0));
}
#[test]
fn textbook_cv() {
assert!(near(textbook().cv, -8.0));
}
#[test]
fn textbook_spi() {
assert!(near(textbook().spi.unwrap(), 0.8));
}
#[test]
fn textbook_cpi() {
assert!(near(textbook().cpi.unwrap(), 0.8333));
}
#[test]
fn textbook_eac() {
assert!(near(textbook().eac.unwrap(), 120.0));
}
#[test]
fn textbook_etc() {
assert!(near(textbook().etc.unwrap(), 72.0));
}
#[test]
fn textbook_vac() {
assert!(near(textbook().vac.unwrap(), -20.0));
}
#[test]
fn textbook_tcpi() {
assert!(near(textbook().tcpi.unwrap(), 60.0 / 52.0));
}
#[test]
fn textbook_has_no_undefined_fields() {
assert!(textbook().undefined.is_empty());
}
fn undefined_reason(r: &EvReport, field: &str) -> Option<String> {
r.undefined
.iter()
.find(|u| u.field == field)
.map(|u| u.reason.clone())
}
#[test]
fn spi_is_null_when_pv_is_zero() {
let b = baseline(vec![row("a", 10.0, 20.0, 100.0)]);
let g = graph(vec![deliverable("a", 100.0, &[])]);
let r = report(&b, &g, &HashMap::new(), &HashMap::new(), &HashMap::new(), 0);
assert!(r.spi.is_none());
}
#[test]
fn spi_zero_pv_reason_is_explained() {
let b = baseline(vec![row("a", 10.0, 20.0, 100.0)]);
let g = graph(vec![deliverable("a", 100.0, &[])]);
let r = report(&b, &g, &HashMap::new(), &HashMap::new(), &HashMap::new(), 0);
assert_eq!(
undefined_reason(&r, "spi").as_deref(),
Some("PV is 0 before any work was planned")
);
}
#[test]
fn cpi_is_null_when_ac_is_zero() {
let r = one(EarningRule::ZeroHundred, DeliverableStatus::Complete, None);
assert!(r.cpi.is_none());
}
#[test]
fn cpi_zero_ac_reason_is_explained() {
let r = one(EarningRule::ZeroHundred, DeliverableStatus::Complete, None);
assert_eq!(
undefined_reason(&r, "cpi").as_deref(),
Some("AC is 0, no cost recorded yet")
);
}
#[test]
fn eac_is_null_when_cpi_is_null() {
let r = one(EarningRule::ZeroHundred, DeliverableStatus::Complete, None);
assert!(r.eac.is_none());
}
#[test]
fn dependents_of_eac_are_null_and_explained() {
let r = one(EarningRule::ZeroHundred, DeliverableStatus::Complete, None);
assert!(r.etc.is_none() && r.vac.is_none());
assert!(undefined_reason(&r, "etc").is_some() && undefined_reason(&r, "vac").is_some());
}
#[test]
fn eac_is_null_when_cpi_is_zero() {
let b = baseline(vec![row("a", 0.0, 10.0, 100.0)]);
let g = graph(vec![deliverable("a", 100.0, &[])]);
let actuals = HashMap::from([(
"a".to_string(),
Actuals {
actual_hours: Some(10.0),
..Actuals::default()
},
)]);
let r = report(&b, &g, &HashMap::new(), &HashMap::new(), &actuals, 5);
assert!(r.eac.is_none());
}
#[test]
fn tcpi_is_null_when_bac_equals_ac() {
let b = baseline(vec![row("a", 0.0, 10.0, 100.0)]);
let g = graph(vec![deliverable("a", 100.0, &[])]);
let actuals = HashMap::from([(
"a".to_string(),
Actuals {
actual_hours: Some(100.0),
..Actuals::default()
},
)]);
let r = report(&b, &g, &HashMap::new(), &HashMap::new(), &actuals, 5);
assert!(r.tcpi.is_none());
}
#[test]
fn tcpi_zero_denominator_reason_is_explained() {
let b = baseline(vec![row("a", 0.0, 10.0, 100.0)]);
let g = graph(vec![deliverable("a", 100.0, &[])]);
let actuals = HashMap::from([(
"a".to_string(),
Actuals {
actual_hours: Some(100.0),
..Actuals::default()
},
)]);
let r = report(&b, &g, &HashMap::new(), &HashMap::new(), &actuals, 5);
assert_eq!(
undefined_reason(&r, "tcpi").as_deref(),
Some("BAC - AC is 0, no budget remains")
);
}
#[test]
fn empty_baseline_yields_all_finite_values() {
let b = baseline(vec![]);
let g = graph(vec![]);
let r = report(&b, &g, &HashMap::new(), &HashMap::new(), &HashMap::new(), 5);
assert!(r.pv.is_finite() && r.ev.is_finite() && r.ac.is_finite());
}
#[test]
fn rows_report_per_deliverable_ev() {
let r = textbook();
let a = r.rows.iter().find(|x| x.id == "a").unwrap();
assert!(near(a.ev, 40.0));
}
#[test]
fn rows_report_status() {
let r = textbook();
let a = r.rows.iter().find(|x| x.id == "a").unwrap();
assert_eq!(a.status, DeliverableStatus::InProgress);
}
#[test]
fn missing_status_defaults_to_pending() {
let r = textbook();
let b = r.rows.iter().find(|x| x.id == "b").unwrap();
assert_eq!(b.status, DeliverableStatus::Pending);
}
#[test]
fn critical_float_consumed_is_forecast_overrun() {
let mut b = baseline(vec![row("a", 0.0, 5.0, 12.0)]);
b.finish_hours = 5.0;
let g = graph(vec![deliverable("a", 12.0, &[])]);
let r = report(&b, &g, &HashMap::new(), &HashMap::new(), &HashMap::new(), 1);
assert!(near(r.critical_float_consumed_hours, 7.0));
}
#[test]
fn critical_float_consumed_never_negative() {
let mut b = baseline(vec![row("a", 0.0, 20.0, 12.0)]);
b.finish_hours = 20.0;
let g = graph(vec![deliverable("a", 12.0, &[])]);
let r = report(&b, &g, &HashMap::new(), &HashMap::new(), &HashMap::new(), 1);
assert!(near(r.critical_float_consumed_hours, 0.0));
}
fn snap(spi: f32, cpi: f32) -> EvSummary {
EvSummary {
baseline_number: 1,
spi: Some(spi),
cpi: Some(cpi),
backfilled: false,
}
}
fn alerts_with(prev: &[EvSummary]) -> Vec<String> {
let b = baseline(vec![row("a", 0.0, 10.0, 100.0)]);
let g = graph(vec![deliverable("a", 100.0, &[])]);
let as_of = b.start + Duration::hours(5);
compute_ev(
&b,
&g,
&HashMap::new(),
&HashMap::new(),
&HashMap::new(),
as_of,
prev,
)
.unwrap()
.alerts
}
#[test]
fn spi_alert_fires_when_two_latest_snapshots_are_below_threshold() {
let a = alerts_with(&[snap(0.95, 1.0), snap(0.8, 1.0), snap(0.85, 1.0)]);
assert_eq!(a, vec!["SPI_BELOW_0_9".to_string()]);
}
#[test]
fn alert_does_not_fire_on_a_single_low_snapshot() {
assert!(alerts_with(&[snap(0.95, 1.0), snap(0.8, 1.0)]).is_empty());
}
#[test]
fn alert_does_not_fire_with_one_snapshot() {
assert!(alerts_with(&[snap(0.5, 0.5)]).is_empty());
}
#[test]
fn cpi_alert_fires_when_two_latest_snapshots_are_below_threshold() {
let a = alerts_with(&[snap(1.0, 0.7), snap(1.0, 0.89)]);
assert_eq!(a, vec!["CPI_BELOW_0_9".to_string()]);
}
#[test]
fn alert_ignores_snapshots_with_undefined_metric() {
let none = EvSummary {
baseline_number: 1,
spi: None,
cpi: None,
backfilled: false,
};
assert!(alerts_with(&[snap(0.5, 0.5), none]).is_empty());
}
#[test]
fn report_is_independent_of_map_insertion_order() {
let b = baseline(vec![row("a", 0.0, 10.0, 50.0), row("b", 0.0, 10.0, 50.0)]);
let g = graph(vec![
deliverable("a", 50.0, &[]),
deliverable("b", 50.0, &[]),
]);
let act = |h: f32| Actuals {
actual_hours: Some(h),
..Actuals::default()
};
let fwd = HashMap::from([("a".to_string(), act(3.0)), ("b".to_string(), act(4.0))]);
let mut rev = HashMap::new();
rev.insert("b".to_string(), act(4.0));
rev.insert("a".to_string(), act(3.0));
let e = HashMap::new();
assert_eq!(
report(&b, &g, &e, &e2(), &fwd, 5),
report(&b, &g, &e, &e2(), &rev, 5)
);
}
fn e2() -> HashMap<String, EarningRule> {
HashMap::new()
}
#[test]
fn removed_deliverable_keeps_baselined_cost_rate() {
let mut br = row("a", 0.0, 10.0, 100.0);
br.cost_rate = 2.0;
let b = baseline(vec![br]);
let g = graph(vec![]);
let actuals = HashMap::from([(
"a".to_string(),
Actuals {
actual_hours: Some(5.0),
..Actuals::default()
},
)]);
let r = report(&b, &g, &HashMap::new(), &HashMap::new(), &actuals, 5);
assert!(near(r.ac, 10.0));
}
#[test]
fn rate_edit_after_baseline_does_not_change_ac() {
let b = baseline(vec![row("a", 0.0, 10.0, 100.0)]);
let mut d = deliverable("a", 100.0, &[]);
d.metadata = serde_json::json!({ "cost_rate": 9.0 });
let actuals = HashMap::from([(
"a".to_string(),
Actuals {
actual_hours: Some(5.0),
..Actuals::default()
},
)]);
let r = report(
&b,
&graph(vec![d]),
&HashMap::new(),
&HashMap::new(),
&actuals,
5,
);
assert!(near(r.ac, 5.0));
}
#[test]
fn invalid_rate_added_after_baseline_does_not_fail_compute() {
let b = baseline(vec![row("a", 0.0, 10.0, 100.0)]);
let mut d = deliverable("a", 100.0, &[]);
d.metadata = serde_json::json!({ "cost_rate": -4.0 });
let r = compute_ev(
&b,
&graph(vec![d]),
&HashMap::new(),
&HashMap::new(),
&HashMap::new(),
b.start,
&[],
);
assert!(r.is_ok());
}
#[test]
fn baseline_captures_cost_rate_per_row() {
let mut d = deliverable("a", 10.0, &[]);
d.metadata = serde_json::json!({ "cost_rate": 3.0 });
let g = graph(vec![d]);
let cpm = compute_cpm(&g).unwrap();
let b = build_baseline(&g, &cpm, at(2026, 1, 5, 0), None, 1).unwrap();
assert!(near(b.rows[0].cost_rate, 3.0));
}
#[test]
fn deliverable_added_after_baseline_is_excluded_and_listed() {
let b = baseline(vec![row("a", 0.0, 10.0, 100.0)]);
let g = graph(vec![
deliverable("z", 40.0, &[]),
deliverable("a", 100.0, &[]),
deliverable("m", 40.0, &[]),
]);
let r = report(&b, &g, &HashMap::new(), &HashMap::new(), &HashMap::new(), 5);
assert_eq!(
r.excluded_unbaselined,
vec!["m".to_string(), "z".to_string()]
);
}
#[test]
fn unbaselined_deliverable_adds_nothing_to_bac() {
let b = baseline(vec![row("a", 0.0, 10.0, 100.0)]);
let g = graph(vec![
deliverable("a", 100.0, &[]),
deliverable("z", 40.0, &[]),
]);
let r = report(&b, &g, &HashMap::new(), &HashMap::new(), &HashMap::new(), 5);
assert!(near(r.bac, 100.0));
}
#[test]
fn negative_reported_hours_fall_back_to_leased() {
assert!(near(ac_for(Some(-2.0), 3.0, None), 3.0));
}
#[test]
fn non_finite_reported_hours_fall_back_to_leased() {
assert!(near(ac_for(Some(f32::NAN), 3.0, None), 3.0));
}
#[test]
fn as_of_before_start_gives_zero_pv() {
let b = baseline(vec![row("a", 0.0, 10.0, 100.0)]);
let g = graph(vec![deliverable("a", 100.0, &[])]);
let r = report(
&b,
&g,
&HashMap::new(),
&HashMap::new(),
&HashMap::new(),
-5,
);
assert!(near(r.pv, 0.0));
}
#[test]
fn as_of_before_start_leaves_spi_null_with_reason() {
let b = baseline(vec![row("a", 0.0, 10.0, 100.0)]);
let g = graph(vec![deliverable("a", 100.0, &[])]);
let r = report(
&b,
&g,
&HashMap::new(),
&HashMap::new(),
&HashMap::new(),
-5,
);
assert!(r.spi.is_none() && undefined_reason(&r, "spi").is_some());
}
#[test]
fn pv_is_flat_over_a_weekend_on_a_working_calendar() {
let mut b = baseline(vec![row("a", 0.0, 80.0, 100.0)]);
b.calendar = Some(Calendar::default());
let g = graph(vec![deliverable("a", 100.0, &[])]);
let at_fri_end = compute_ev(
&b,
&g,
&HashMap::new(),
&HashMap::new(),
&HashMap::new(),
at(2026, 1, 9, 12),
&[],
)
.unwrap();
let mon = compute_ev(
&b,
&g,
&HashMap::new(),
&HashMap::new(),
&HashMap::new(),
at(2026, 1, 12, 0),
&[],
)
.unwrap();
assert!(near(at_fri_end.pv, mon.pv));
}
#[test]
fn eac_reason_when_cpi_is_zero_is_explained() {
let b = baseline(vec![row("a", 0.0, 10.0, 100.0)]);
let g = graph(vec![deliverable("a", 100.0, &[])]);
let actuals = HashMap::from([(
"a".to_string(),
Actuals {
actual_hours: Some(10.0),
..Actuals::default()
},
)]);
let r = report(&b, &g, &HashMap::new(), &HashMap::new(), &actuals, 5);
assert_eq!(
undefined_reason(&r, "eac").as_deref(),
Some("CPI is 0, nothing earned for the cost spent")
);
}
#[test]
fn tcpi_is_negative_when_ac_exceeds_bac() {
let b = baseline(vec![row("a", 0.0, 10.0, 100.0)]);
let g = graph(vec![deliverable("a", 100.0, &[])]);
let st = statuses(&[("a", DeliverableStatus::InProgress)]);
let rules = HashMap::from([("a".to_string(), EarningRule::Weighted)]);
let actuals = HashMap::from([(
"a".to_string(),
Actuals {
earned_pct: Some(50),
actual_hours: Some(150.0),
..Actuals::default()
},
)]);
let r = report(&b, &g, &st, &rules, &actuals, 5);
assert!(near(r.tcpi.unwrap(), -1.0));
}
#[test]
fn f32_overflow_in_a_ratio_becomes_undefined() {
let b = baseline(vec![
row("a", 0.0, 10.0, 3.0e38),
row("b", 0.0, 10.0, 3.0e38),
]);
let g = graph(vec![deliverable("a", 1.0, &[]), deliverable("b", 1.0, &[])]);
let st = statuses(&[("a", DeliverableStatus::Complete)]);
let actuals = HashMap::from([(
"a".to_string(),
Actuals {
actual_hours: Some(1.0e-30),
..Actuals::default()
},
)]);
let r = report(&b, &g, &st, &HashMap::new(), &actuals, 5);
assert!(r.cpi.is_none() && undefined_reason(&r, "cpi").is_some());
}
#[test]
fn alert_needs_both_of_the_two_previous_snapshots() {
assert!(alerts_with(&[snap(0.5, 1.0), snap(0.5, 1.0), snap(1.0, 1.0)]).is_empty());
}
#[test]
fn elapsed_matches_naive_minute_loop_over_random_spans() {
let mut seed: u64 = 0x5eed_1234_abcd_ef01;
let mut next = move |n: u64| {
seed = seed
.wrapping_mul(6364136223846793005)
.wrapping_add(1442695040888963407);
(seed >> 33) % n
};
let names = ["mon", "tue", "wed", "thu", "fri", "sat", "sun"];
let mut mismatches = Vec::new();
for case in 0..60 {
let start = at(2026, 1, 3, 0) + Duration::minutes(next(60 * 24 * 14) as i64);
let span = Duration::minutes(next(60 * 24 * 40) as i64 + 1);
let off = next(2881) as i32 - 1440;
let n_days = 1 + next(7) as usize;
let first = next(7) as usize;
let workdays: Vec<String> = (0..n_days)
.map(|i| names[(first + i) % 7].to_string())
.collect();
let hpd = [8.0_f32, 6.5, 24.0][next(3) as usize];
let c = Calendar {
hours_per_day: hpd,
workdays: workdays.clone(),
utc_offset_minutes: off,
};
let got = elapsed_hours(start, start + span, Some(&c)).unwrap();
let mut naive = 0u64;
let window = (f64::from(hpd) * 60.0) as i64;
let mut m = start;
let end = start + span;
while m < end {
let local = m + Duration::minutes(i64::from(off));
let name = names[local.weekday().num_days_from_monday() as usize];
let mins = i64::from(local.hour()) * 60 + i64::from(local.minute());
if workdays.iter().any(|w| w == name) && mins < window {
naive += 1;
}
m += Duration::minutes(1);
}
let want = naive as f32 / 60.0;
if (got - want).abs() > 1e-2 {
mismatches.push((case, got, want));
}
}
assert!(mismatches.is_empty(), "{mismatches:?}");
}
#[test]
fn trend_alerts_fire_spi_when_two_latest_are_low() {
let a = trend_alerts(&[snap(0.8, 1.0), snap(0.85, 1.0)], 1);
assert_eq!(a, vec!["SPI_BELOW_0_9".to_string()]);
}
#[test]
fn baseline_rejects_budget_total_beyond_f32() {
let heavy = |id: &str| {
let mut d = deliverable(id, 1.0, &[]);
d.metadata = serde_json::json!({ "cost_rate": 3.0e38 });
d
};
let g = graph(vec![heavy("a"), heavy("b")]);
let cpm = compute_cpm(&g).unwrap();
let e = build_baseline(&g, &cpm, at(2026, 1, 5, 0), None, 1);
assert!(matches!(e, Err(PlannerError::InvalidGraph { .. })));
}
#[test]
fn ev_rejects_actual_cost_beyond_f32() {
let mut br = row("a", 0.0, 10.0, 100.0);
br.cost_rate = 3.0e38;
let b = baseline(vec![br]);
let g = graph(vec![deliverable("a", 100.0, &[])]);
let actuals = HashMap::from([(
"a".to_string(),
Actuals {
actual_hours: Some(1.0e6),
..Actuals::default()
},
)]);
let as_of = b.start + Duration::hours(5);
let e = compute_ev(
&b,
&g,
&HashMap::new(),
&HashMap::new(),
&actuals,
as_of,
&[],
);
assert!(matches!(e, Err(PlannerError::InvalidGraph { .. })));
}
#[test]
fn calendar_rejects_unknown_fields() {
let c = serde_json::from_value::<Calendar>(serde_json::json!({ "hours": 8 }));
assert!(c.is_err());
}
fn summary_of(r: &EvReport) -> SnapshotSummary {
SnapshotSummary::from_report(r, r.as_of)
}
#[test]
fn snapshot_summary_carries_report_spi() {
let r = textbook();
assert_eq!(summary_of(&r).spi, r.spi);
}
#[test]
fn snapshot_markdown_starts_with_header_row() {
let md = render_snapshots_markdown(&[summary_of(&textbook())]);
assert!(md.starts_with("| date | PV | EV | AC | SPI | CPI | EAC |\n"));
}
#[test]
fn snapshot_markdown_renders_one_row_per_snapshot() {
let s = summary_of(&textbook());
let md = render_snapshots_markdown(&[s.clone(), s]);
assert_eq!(md.lines().count(), 4);
}
#[test]
fn snapshot_markdown_row_shows_textbook_values() {
let md = render_snapshots_markdown(&[summary_of(&textbook())]);
assert_eq!(
md.lines().nth(2),
Some("| 2026-01-05T10:00Z | 50.00 | 40.00 | 48.00 | 0.80 | 0.83 | 120.00 |")
);
}
#[test]
fn snapshot_markdown_renders_undefined_ratio_as_na() {
let r = one(EarningRule::ZeroHundred, DeliverableStatus::Pending, None);
let md = render_snapshots_markdown(&[summary_of(&r)]);
assert!(
md.lines()
.nth(2)
.is_some_and(|l| l.ends_with("| n/a | n/a |"))
);
}
#[test]
fn alerts_ignore_a_backfilled_new_reading() {
let mut backfilled = snap(0.5, 1.0);
backfilled.backfilled = true;
assert!(trend_alerts(&[snap(0.5, 1.0), backfilled], 1).is_empty());
}
#[test]
fn snapshot_more_than_an_hour_behind_its_taken_at_is_backfilled() {
let r = textbook();
assert!(SnapshotSummary::from_report(&r, r.as_of + Duration::minutes(61)).backfilled);
}
#[test]
fn snapshot_within_an_hour_of_its_taken_at_is_not_backfilled() {
let r = textbook();
assert!(!SnapshotSummary::from_report(&r, r.as_of + Duration::minutes(60)).backfilled);
}
#[test]
fn removed_row_earns_its_frozen_percent() {
let b = baseline(vec![row("a", 0.0, 10.0, 100.0)]);
let actuals = HashMap::from([(
"a".to_string(),
Actuals {
frozen_pct: Some(40),
..Actuals::default()
},
)]);
let r = report(&b, &graph(vec![]), &HashMap::new(), &e2(), &actuals, 5);
assert!(near(r.ev, 40.0));
}
#[test]
fn removed_row_without_frozen_percent_earns_nothing() {
let b = baseline(vec![row("a", 0.0, 10.0, 100.0)]);
let st = statuses(&[("a", DeliverableStatus::Complete)]);
let r = report(&b, &graph(vec![]), &st, &e2(), &HashMap::new(), 5);
assert!(near(r.ev, 0.0));
}
#[test]
fn unbaselined_actuals_count_in_ac_at_rate_one() {
let b = baseline(vec![row("a", 0.0, 10.0, 100.0)]);
let g = graph(vec![
deliverable("a", 100.0, &[]),
deliverable("n", 5.0, &[]),
]);
let actuals = HashMap::from([(
"n".to_string(),
Actuals {
actual_hours: Some(3.0),
..Actuals::default()
},
)]);
let r = report(&b, &g, &HashMap::new(), &e2(), &actuals, 5);
assert!(near(r.ac, 3.0));
}
#[test]
fn frozen_pct_of_a_complete_deliverable_is_100() {
let pct = frozen_pct(EarningRule::ZeroHundred, &DeliverableStatus::Complete, None);
assert_eq!(pct, 100);
}
#[test]
fn alerts_ignore_snapshots_from_previous_baseline() {
assert!(trend_alerts(&[snap(0.5, 0.5), snap(0.5, 0.5)], 2).is_empty());
}
#[test]
fn alerts_use_the_two_latest_snapshots_of_the_current_baseline() {
let mut current = snap(0.5, 1.0);
current.baseline_number = 2;
let a = trend_alerts(&[current.clone(), snap(1.0, 1.0), current], 2);
assert_eq!(a, vec!["SPI_BELOW_0_9".to_string()]);
}
#[test]
fn snapshot_summary_explains_undefined_ratios() {
let r = one(EarningRule::ZeroHundred, DeliverableStatus::Pending, None);
assert_eq!(summary_of(&r).undefined, r.undefined);
}
#[test]
fn summary_without_undefined_field_decodes() {
let mut v = serde_json::to_value(summary_of(&textbook())).unwrap();
v.as_object_mut().unwrap().remove("undefined");
assert!(serde_json::from_value::<SnapshotSummary>(v).is_ok());
}
}