# Bitcoin Implementation Consolidation Plan
[AIR-3][AIS-3][BPC-3]

## Implementation Schedule

This document outlines the specific implementation steps for the Bitcoin consolidation process, following the strategy defined in [CONSOLIDATION_STRATEGY.md](./CONSOLIDATION_STRATEGY.md).

## Phase 1: Core Structure Validation

**Status: In Progress**

### Tasks:

1. ✅ Create consolidated branch and strategy document
2. ⏳ Validate existing hexagonal architecture components
   - Ensure all required directories exist with proper structure
   - Verify port interfaces are properly defined
   - Check adapter implementations
3. ⏳ Create implementation stubs for missing components
   - Fill in directory structure where needed
   - Create interface placeholders for future implementation

### Components to Validate:

- anya-bitcoin/ports/
- anya-bitcoin/adapters/
- anya-bitcoin/core/ (structure only)
- anya-bitcoin/layer2/ (structure only)

## Phase 2: Core Bitcoin Implementation

**Status: Planned**

### Tasks:

1. ⏳ Consolidate BIP-341 (Taproot) implementation
   - Merge consensus rules
   - Integrate validation logic
   - Update documentation
2. ⏳ Consolidate BIP-342 (Tapscript) implementation
   - Merge script execution logic
   - Integrate validation logic
   - Update documentation
3. ⏳ Implement consensus rules with proper validation
4. ⏳ Implement script interpreter with test cases
5. ⏳ Implement transaction validation components

### Source Components:

- feature/bitcoin-core: For core implementation details
- feature/bitcoin-implementation: For implementation-specific logic

## Phase 3: Layer 2 Protocol Integration

**Status: Planned**

### Tasks:

1. ⏳ Consolidate RGB protocol implementation
   - Integrate client and node components
   - Merge schema definitions
   - Update wallet integration
2. ⏳ Consolidate DLC implementation
   - Merge adaptor signatures
   - Integrate contract execution
   - Update oracle component
3. ⏳ Consolidate Lightning components
   - Integrate with core Bitcoin functionality
   - Update channel management
   - Verify BOLT compliance
4. ⏳ Consolidate RSK bridge implementation
   - Update federation logic
   - Integrate contract execution
   - Verify bridge security

### Source Components:

- feature/bitcoin-layer2: For all Layer 2 protocol implementations

## Phase 4: Testing Infrastructure

**Status: Planned**

### Tasks:

1. ⏳ Consolidate unit tests for all components
2. ⏳ Integrate BIP compliance tests
3. ⏳ Set up benchmarking infrastructure
4. ⏳ Create integration test suite
5. ⏳ Implement continuous integration hooks

### Source Components:

- feature/bitcoin-testing: For comprehensive test suite
- All feature branches: For component-specific tests

## Phase 5: Documentation & Compliance

**Status: Planned**

### Tasks:

1. ⏳ Update all module documentation
2. ⏳ Verify BIP implementation status documentation
3. ⏳ Create consolidated API documentation
4. ⏳ Verify compliance with Bitcoin Development Framework v2.5
5. ⏳ Prepare final PR with implementation checklist

## Timeline

1. **Phase 1**: 1-2 days
2. **Phase 2**: 2-3 days
3. **Phase 3**: 2-3 days
4. **Phase 4**: 1-2 days
5. **Phase 5**: 1 day

**Total**: 7-11 days

## Implementation Updates

This section will be updated as implementation progresses.

### Updates:

- **2025-05-02**: Created consolidation branch and strategy
- **2025-05-02**: Created implementation plan