Skip to main content

EvReport

Struct EvReport 

Source
pub struct EvReport {
Show 22 fields pub as_of: DateTime<Utc>, pub baseline_number: u32, pub backfilled: bool, pub bac: f32, pub pv: f32, pub ev: f32, pub ac: f32, pub sv: f32, pub cv: f32, pub spi: Option<f32>, pub cpi: Option<f32>, pub eac: Option<f32>, pub etc: Option<f32>, pub vac: Option<f32>, pub tcpi: Option<f32>, pub undefined: Vec<Undefined>, pub rows: Vec<EvRow>, pub critical_float_consumed_hours: f32, pub alerts: Vec<String>, pub excluded_unbaselined: Vec<String>, pub archived: bool, pub active_plan: Option<String>,
}
Expand description

Full earned-value report.

Fields§

§as_of: DateTime<Utc>

PV status date. EV and AC reflect progress and actuals recorded up to the moment the report was computed.

§baseline_number: u32§backfilled: bool

True when the baseline was taken with backfill_from.

§bac: f32§pv: f32§ev: f32§ac: f32§sv: f32§cv: f32§spi: Option<f32>§cpi: Option<f32>§eac: Option<f32>§etc: Option<f32>§vac: Option<f32>§tcpi: Option<f32>§undefined: Vec<Undefined>§rows: Vec<EvRow>§critical_float_consumed_hours: f32§alerts: Vec<String>§excluded_unbaselined: Vec<String>

Ids in the live graph but absent from the baseline (sorted, synthetic endpoints excluded). They earn no value and carry no budget until a re-baseline, but their spend counts in AC at rate 1.0 (their live cost_rate applies only once a baseline row exists).

§archived: bool

True when the plan belongs to an effectively archived variant (its line is archived or the variant itself is); false for unnamed plans and live variants. Archived variants stay readable through ev.

§active_plan: Option<String>

Only when EvReport::archived is true: the name of the project’s single active plan line, so a caller holding a stale id learns where the live work is. None when not archived or when the project has zero or several active lines; omitted from the wire when None (the report’s nulls are reserved for metrics explained by EvReport::undefined).

Trait Implementations§

Source§

impl Clone for EvReport

Source§

fn clone(&self) -> Self

Returns a duplicate of the value. Read more
1.0.0 (const: unstable) · Source§

fn clone_from(&mut self, source: &Self)

Performs copy-assignment from source. Read more
Source§

impl Debug for EvReport

Source§

fn fmt(&self, f: &mut Formatter<'_>) -> Result

Formats the value using the given formatter. Read more
Source§

impl<'de> Deserialize<'de> for EvReport

Source§

fn deserialize<__D>(__deserializer: __D) -> Result<Self, __D::Error>
where __D: Deserializer<'de>,

Deserialize this value from the given Serde deserializer. Read more
Source§

impl PartialEq for EvReport

Source§

fn eq(&self, other: &Self) -> bool

Equality operator ==. Read more
1.0.0 (const: unstable) · Source§

fn ne(&self, other: &Rhs) -> bool

Inequality operator !=. Read more
Source§

impl Serialize for EvReport

Source§

fn serialize<__S>(&self, __serializer: __S) -> Result<__S::Ok, __S::Error>
where __S: Serializer,

Serialize this value into the given Serde serializer. Read more
Source§

impl StructuralPartialEq for EvReport

Auto Trait Implementations§

Blanket Implementations§

Source§

impl<T> Any for T
where T: 'static + ?Sized,

Source§

fn type_id(&self) -> TypeId

Gets the TypeId of self. Read more
Source§

impl<T> Borrow<T> for T
where T: ?Sized,

Source§

fn borrow(&self) -> &T

Immutably borrows from an owned value. Read more
Source§

impl<T> BorrowMut<T> for T
where T: ?Sized,

Source§

fn borrow_mut(&mut self) -> &mut T

Mutably borrows from an owned value. Read more
Source§

impl<ST, DT> CastableFrom<ST, Initialized, Initialized> for DT
where ST: ?Sized, DT: ?Sized,

Source§

impl<ST, DT> CastableFrom<ST, Uninit, Uninit> for DT
where ST: ?Sized, DT: ?Sized,

Source§

impl<T> CloneToUninit for T
where T: Clone,

Source§

unsafe fn clone_to_uninit(&self, dest: *mut u8)

🔬This is a nightly-only experimental API. (clone_to_uninit)
Performs copy-assignment from self to dest. Read more
Source§

impl<T> DeserializeOwned for T
where T: for<'de> Deserialize<'de>,

Source§

impl<T> DynClone for T
where T: Clone,

Source§

fn __clone_box(&self, _: Private) -> *mut ()

Source§

impl<T> From<T> for T

Source§

fn from(t: T) -> T

Returns the argument unchanged.

Source§

impl<T> Instrument for T

Source§

fn instrument(self, span: Span) -> Instrumented<Self> ⓘ

Instruments this type with the provided Span, returning an Instrumented wrapper. Read more
Source§

fn in_current_span(self) -> Instrumented<Self> ⓘ

Instruments this type with the current Span, returning an Instrumented wrapper. Read more
Source§

impl<T, U> Into<U> for T
where U: From<T>,

Source§

fn into(self) -> U

Calls U::from(self).

That is, this conversion is whatever the implementation of From<T> for U chooses to do.

Source§

impl<T> IntoToolOutput for T
where T: Serialize + 'static,

Source§

fn into_tool_output(self) -> Result<ToolOutput, ToolExecutionError>

Convert this value without routing structured data through a string.
Source§

impl<T> PolicyExt for T
where T: ?Sized,

Source§

fn and<P, B, E>(self, other: P) -> And<T, P>
where T: Sized + Policy<B, E>, P: Policy<B, E>,

Create a new Policy that returns Action::Follow only if self and other return Action::Follow. Read more
Source§

fn or<P, B, E>(self, other: P) -> Or<T, P>
where T: Sized + Policy<B, E>, P: Policy<B, E>,

Create a new Policy that returns Action::Follow if either self or other returns Action::Follow. Read more
Source§

impl<T> Read<Exclusive, BecauseExclusive> for T
where T: ?Sized,

Source§

impl<T> Same for T

Source§

type Output = T

Should always be Self
Source§

impl<T> ToOwned for T
where T: Clone,

Source§

type Owned = T

The resulting type after obtaining ownership.
Source§

fn to_owned(&self) -> T

Creates owned data from borrowed data, usually by cloning. Read more
Source§

fn clone_into(&self, target: &mut T)

Uses borrowed data to replace owned data, usually by cloning. Read more
Source§

impl<T, U> TryFrom<U> for T
where U: Into<T>,

Source§

type Error = !

The type returned in the event of a conversion error.
Source§

fn try_from(value: U) -> Result<T, !>

Performs the conversion.
Source§

impl<T, U> TryInto<U> for T
where U: TryFrom<T>,

Source§

type Error = <U as TryFrom<T>>::Error

The type returned in the event of a conversion error.
Source§

fn try_into(self) -> Result<U, <U as TryFrom<T>>::Error>

Performs the conversion.
Source§

impl<V, T> VZip<V> for T
where V: MultiLane<T>,

Source§

fn vzip(self) -> V

Source§

impl<T> WasmCompatSend for T
where T: Send,

Source§

impl<T> WasmCompatSync for T
where T: Sync,

Source§

impl<T> WithSubscriber for T

Source§

fn with_subscriber<S>(self, subscriber: S) -> WithDispatch<Self> ⓘ
where S: Into<Dispatch>,

Attaches the provided Subscriber to this type, returning a WithDispatch wrapper. Read more
Source§

fn with_current_subscriber(self) -> WithDispatch<Self> ⓘ

Attaches the current default Subscriber to this type, returning a WithDispatch wrapper. Read more