Module network

Module network 

Source

Structs§

BusVoltages
Every bus’s voltage magnitude and the sine and cosine of its angle, taken once per Newton iteration and read by both the power injections and the Jacobian fill — which used to evaluate the same sines and cosines each.
ShuntAdm
A lumped shunt admittance to be added to the Y-bus diagonal at bus at.
ShuntAdm3Ph
A three-phase shunt admittance, given as positive- and zero-sequence values.
YBus
A mutable Y-bus under construction: a COO (triplet) accumulator. Entries at the same (row, col) are summed once finalized via finish() — this gives the same accumulation semantics as the old dense ybus[(i,j)] += val, including for parallel branches between the same two buses (e.g. symmetric/distribution-case’s two parallel transformers).
YBusSparse
A finalized, frozen Y-bus: consolidated per-row admittance neighbors (for sparse-aware assembly of the linear initial guess and the Jacobian) plus a ready-to-use sparse matrix (for power_injections’s mat-vec, needed every Newton-Raphson iteration). Built once via YBus::finish.

Constants§

DELTA
WYE
PGM’s WindingType codes, as they appear on PgmTransformer’s winding_from/winding_to (common/enum.hpp).
WYE_N
ZIGZAG
ZIGZAG_N

Functions§

branch_calc_param
Computes the four branch admittance entries [yff, yft, ytf, ytt] for a two-winding transformer branch. Implements PGM’s π-equivalent model: y_shunt is split equally between both terminals. The complex tap ratio tap = k·exp(jθ) carries both the off-nominal magnitude k and the vector-group phase shift θ.
build_ybus
build_ybus_3ph
Builds a 3N×3N phase-domain Y-bus from a list of three-phase lines.
build_ybus_with_outages
Builds a Y-bus with the branches flagged in outaged taken out of service, keeping their structural entries so the sparsity pattern is identical to the intact network’s.
connected_components
Groups buses into connected components via the Y-bus’s actual admittance graph — two buses are in the same component iff there’s a path of nonzero off-diagonal Y-bus entries between them (row(i)’s own diagonal self-entry, j == i, is skipped, since it’s a shunt term, not a branch to another bus). Each returned Vec<usize> is one component’s member bus indices, sorted ascending; components are returned in ascending order of their first (lowest-index) member.
effective_injection
Computes the effective (P, Q) injection at a bus at its current voltage magnitude: p_spec/q_spec (constant-power) plus any ZIP terms evaluated at bus.voltage_mag. For a bus with no ZIP terms this is exactly (bus.p_spec, bus.q_spec).
half_open_branch_shunt
The effective shunt admittance seen at a half-open transformer’s connected end: y_shunt/2 + 1/(1/y_series + 2/y_shunt). Mathematically, this expression’s limit as y_shunt → 0 is exactly 0 (with no magnetizing branch at all, opening one end truly isolates the connected side — there’s no other path for current to flow), but literal complex division by y_shunt = 0+0j hits a 0/0 pattern and evaluates to NaN instead of that limit. y_shunt == 0 exactly is common in practice (magnetizing admittance is often left unspecified/zero, e.g. in real CGMES transformer data far more often than gridoxide’s own PGM test fixtures happen to combine with a half-open status), so this needs an explicit guard, not just trusting the formula.
line3ph_blocks
The four 3×3 phase-domain π-model blocks of a three-phase line, [Yff, Yft, Ytf, Ytt] — the same order and meaning as branch_calc_param’s four scalars.
linear_initial_guess
Computes a smarter-than-flat-start initial voltage guess for Newton-Raphson by solving one linearized constant-admittance system, mirroring PGM’s NewtonRaphsonPFSolver::initialize_derived_solver. Each energized (PQ) bus’s injection is approximated as a constant admittance y = -conj(S) evaluated at the flat-start |V|=1 assumption and added to the Y-bus diagonal; Slack buses (both real sources and de-energized nodes, which gridoxide models as fixed Slack buses at V=0) keep their already-set voltage. The resulting linear system Y'_nn·U_n = -Y'_ns·U_s is solved for the unknown PQ bus voltages via LU decomposition, and voltage_mag/ voltage_ang are overwritten with the result. If the reduced system is singular, buses are left at their prior (flat-start) values. PGM applies no step damping or voltage clamping beyond this — a better initial guess is its only robustness mechanism, needed on networks combining weak sources with large transformer phase shifts where plain flat-start NR diverges.
power_injections
power_injections_from
power_injections from voltages already taken.
solve_constant_admittance
Solves one reduced constant-admittance system over unknown_idx, writing voltage_mag/voltage_ang back for those buses only.
source_impedance_pu
Computes per-unit source impedance (r, x) from short-circuit power and R/X ratio. Matches PGM’s Source::math_param (z_abs = base_power_3p / sk, with no dependence on u_ref — the source’s reference voltage only sets the fixed voltage at the virtual slack bus, not the branch impedance).
source_impedance_pu_seq
Computes per-unit positive- and zero-sequence source impedance (r1, x1, r0, x0), where z01_ratio = z0 / z1 (PGM convention), so the zero-sequence impedance is z1 * z01_ratio.
stamp_shunts
Adds a set of lumped shunt admittances to the Y-bus diagonal.
stamp_shunts_3ph
Adds a set of three-phase shunt admittances to the phase-domain Y-bus diagonal blocks.
stamp_transformers_3ph
Stamps asymmetric transformer contributions into a 3N×3N phase-domain Y-bus.
structural_component_count
How many components the branch list forms, counting a branch as connecting exactly when build_ybus would give it a structural off-diagonal entry.
tap_ratio_from_voltages
Computes the complex off-nominal tap ratio k · exp(j·clock·π/6) from a numerator/denominator voltage pair. u_num/u_denom are the (possibly tap-adjusted) nameplate voltages on the two sides; the magnitude ratio u_num/u_denom gives k. Used both by transformer_tap (2-winding) and the three-winding/asymmetric-transformer paths.
three_winding_star_params
Computes the three-winding transformer’s delta→wye (star-equivalent) short-circuit voltage and loss parameters (uk_T1, uk_T2, uk_T3) and (pk_T1, pk_T2, pk_T3), referenced to side 1’s power base. Mirrors PGM’s ThreeWindingTransformer::calculate_uk/calculate_pk (tap-dependent uk_min/uk_max adjustment is not implemented — this three-winding support only covers fixtures with no such tap-dependent impedance range).
transformer3ph_blocks
The four 3×3 phase-domain blocks of a three-phase transformer, in the same order as line3ph_blocks.
transformer_admittances
transformer_admittances_ex
Computes per-unit series and shunt admittances from transformer nameplate data. Both are referenced to the to-side (u2) voltage base. Like transformer_admittances, but with separately specified nameplate (“to”-field, used for absolute impedance/shunt magnitude scaling) and rated (“to”-base, used for the per-unit base) to-side voltages — needed when the two differ, as for a three-winding transformer’s internal star leg, whose nameplate voltage tracks the tapped side while its per-unit base stays pinned to the physical node’s rated voltage. uk/pk may be negative (as PGM’s three-winding delta→wye conversion can produce); the sign of uk is carried onto the series reactance, matching PGM’s transformer_params().
transformer_seq_params
Computes sequence-domain (y0, y1, y2) branch admittance parameters (each [yff, yft, ytf, ytt]) for a two-winding transformer, needed for asymmetric (3-phase) power flow and for short-circuit calculation.
transformer_tap
Computes the complex off-nominal tap ratio k·exp(j·clock·π/6) from transformer nameplate data.