voronator 0.1.0

Implements the Voronoi diagram construction as a dual of the Delaunay triangulation for a set of points and the construction of a centroidal tesselation of a Delaunay triangulation.
Documentation
Builds

voronator's sandbox limits

All the builds on docs.rs are executed inside a sandbox with limited resources. The limits for this crate are the following:

Available RAM 6 GB
Maximum rustdoc execution time 15 minutes
Maximum size of a build log 100 kB
Network access blocked
Maximum number of build targets 10

If a build fails because it hit one of those limits please open an issue to get them increased.